Submission
Compile and defend the NDA, BLA or MAA: review, inspections, labelling.
Open this in the interactive map →
What happens The work of this stage
Compile and submit the application in eCTD format (Module 1 regional, 2 summaries, 3 quality, 4 nonclinical, 5 clinical). A pre-submission meeting (pre-NDA or pre-BLA; EU pre-submission with EMA) settles format and content questions. After submission: validation or filing review, then scientific review with information requests, possible advisory committee, pre-approval inspection (PAI) of manufacturing and testing sites, GCP inspections of trial sites, and labelling negotiation. In the EU the centralised procedure produces a CHMP opinion (210 active days, plus clock stops) and a Commission decision within about 67 days; national pricing and reimbursement follow separately. FDA review goals come from PDUFA VII (through September 2027); the proposed PDUFA VIII commitment letter published in 2026 keeps the same 10 and 6 month goals.
Functions active 9 functions busy
Regulatory affairs (lead) and regulatory operations (publishing)Regulatory CMCQuality (inspection readiness, site hosting)Medical writingClinical, biostatistics (responses to questions)Pharmacovigilance (RMP, safety updates)Manufacturing (PAI, launch stock)Commercial launch readiness, market accessLegal (exclusivity, patents, Orange Book or Purple Book listing)
GxP that applies Regulations and validation
No new regime, but this is when the existing ones are inspected. GMP pre-approval inspection checks the data in Module 3 against the site's actual records, so data integrity of lab systems (CDS, LIMS, ELN) and of batch records is examined directly. GCP inspections verify trial data. A failed inspection is a common cause of a complete response letter.
Key deliverables 7 outputs
- NDA or BLA (US), MAA (EU) in eCTD
- Responses to information requests, often within days
- Advisory committee briefing document (if convened)
- Proposed labelling (USPI; EU SmPC, PIL, labelling)
- REMS (US, if required); RMP (EU, always for new actives)
- 120-day safety update (US)
- Successful PAI and GCP inspections
Gate decision at the end What has to be true to move on
Approval, or a Complete Response Letter (US) listing deficiencies, or a negative CHMP opinion (EU). A CRL for CMC or inspection reasons is a frequent outcome that can be resolved within months; a CRL for efficacy usually means another trial.